This manual is designed to be utilized as a guide when installing post frame and residential roofing systems.
Pro rib steel roofing installation instructions.
Pro panel ii spanish.
Learn the correct fastening technique for pro rib and premium pro rib fasteners.
Pdf 779 kb ul 560 pro rib roof construction.
Classic rib spanish.
This guide must by read in its entirety before beginning installation.
Concealed fastened roof panels.
This guide is supplied by fabral inc.
Install the roofing screws vertically along each rib in the panel.
4 panel wood screw space according to recommended fastening pattern and local codes.
It is the responsibility of the erector to ensure the safe installation of this product system.
To be made to run your steel correctly.
Pdf 2 mb interior liner panel.
For pro rib and premium pro rib panels the fasteners at the top and the bottom of the panel should be placed in the flat next to the rib.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Consult metal sales for any additional information not outlined in this manual.
Pdf 780 kb premium pro steel gutter systems installation.
Pro panel ii install guide.
Spanish language post frame install guide.
Pdf 31 kb ul 529 pro.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
For use by its customers and is intended to be a guide only.
A b overlap overlap eave ridge rake installing residential roof steel.
5 outside closure install along upper edge of panels about 2 below the edge.
Pdf 2 mb chimney flashing instructions.
3 5 rib installation guidelines caution.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
Place the first screw.
To prevent penetration of water insects and debris at the ridge outside closures are inserted between the ridge cap and the top end of the panel.
Pdf 740 kb steel siding installation.
Pdf 4 mb.
Self drilling lap screws are used to attach ridge caps.
5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater.
The first panel should be placed so the overlap side of the panel is towards the rake end of the roof.
Below is a list of all installation guidelines available for download from metal sales.
Drive through the outside closure and the ribs of the panel beneath.