Position plywood clips onto the top or upper horizontal edge of the installed plywood panels between each rafter.
Proper installation of hclips on roof sheathing.
This video shows how some roofs fail under heavy winds in uplift situations.
How to use plywood clips step 1.
Fasten panels with a minimum of.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
Proper installation of apa rated sheathing for roof applications step 1.
Home builder s guide to coastal construction 7 1.
Provide roof ventilation according to building codes see hints below and figure 2.
Roof sheathing installation 1 of 3.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.
H clips provide additional stiffness between bearing points for the unsupported edges of wood panel plywood or osb roof sheathing along with the necessary 1 8 gap for expansion as shown below illustrated on a bag of simpson h clips.
Hammer in the clip to the parallel beam using 2 5 inches 6 4 cm nails.
Ventilate the roof according to current building codes step 3.
Click to expand contents.
Install a full horizontal row of plywood sheathing following standard practices.
Properly fasten panels including fastening and spacing hints step 4.
Once you ve spaced out where you are going to attach the clips they are ready to be attached.
This process starts with nailing them into the parallel beam.
These nails go through the base plate of the clip.
To provide information about proper roof sheathing installation emphasize its importance in coastal construction and illustrate fastening methods that will enhance the durability of a building in a high wind area.
Keep nails 3 8 inches from the edges.
Slide the sheet one rafter width over the end of the roof so the edge is centered on the next rafter offset one rafter spacing from the first piece of installed sheathing from the row below.
Check the nailing surface is level step 2.
Keep these tips in mind when roofing in hurricane areas.
Not always required but a good idea.
Install the next row of plywood into position by.
And scroll down to see more details on each with installation hints and tips below.
Space joints on adjoining rows by two framing members.
Cover sheathing with.
Install h clips between adjacent rows of panels every 12 to 16 inches but not over framing members.