Tom silva starts off his roofing lesson with the apprentices by stressing the.
Proper way to install roof drip edge.
No cutting is needed for this piece.
Once all the underlayment is applied go back and place.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
Preformed drip edge can be made of aluminum galvanized steel or copper.
The causeway connecting the house to the new garage in law suite needs a roof.
How to install a drip edge.
Make sure the outer edge extends over the gutter.
Slightly open the hemmed edge to slide this piece over top of the installed piece on the eave.
This could cause the sheathing or fascias to rot after a few years.
Secure the drip edge with roofing cement.
Install roof drip edge along the eaves add underlayment then place drip.
When this occurs the water may run back under the edge of the shingles often wetting the roof deck.
Save yourself some.
Three tips for overlapping drip edge flashing.
On the gable rake install drip edge starting at the bottom and working up.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Place the metal roof drip edge flashing along the gable ends.
Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave.
How to install drip edge flashing to a new roof.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Tip 2 is.
If it doesn t pull the drip edge out slightly from under the shingles.
The roof leg should extend a minimum of 2 back onto the roof sheathing.