Wear heavy duty gloves and work boots.
Putting down rolled roofing.
Drip edge or drip cap is either plastic or sheet metal.
Preparing to add rolled roofing 1.
Roofing contractor maintenance professional expert interview.
It not only protects the roof but it also protects the fascia.
Step 4 trim any roofing that extends beyond the edge of the roof.
The roofing should extend 1 inch beyond the drip edge.
Purchase the appropriate amount of rolled roofing.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
An underlayment of felt roofing is optional.
Install peel and stick roofing in a similar manner.
Cut the bitumen sheets to length with a.
The roofing should overhang the eaves by inch except where you install drip edge flashing on top of the roofing along the rake edge.
Nail down the 18 inch roll roofing sheet that it is covering the valley.
To seal a plumbing vent spread roofing.
Installing the torch down roofing involves flames and melted asphalt.
Roll modified bitumen roofing sheets over the entire roof.
X expert source david bitan.
Bitumen roofing rolls can be large and heavy so get help.
Once the first row is done add approximately two inches of cement to the top of the first row to secure the second row of roofing.
In roofing one square equals 100 square feet.
Take proper safety precautions.
The nails should start 3 4 inch from the edges of the roofing and be 6 inches apart throughout the roofing s surface.
Align the roofing with the chalk line and nail down the edge that runs along the drip edge working out any bubbles as you go.
Apply about two inches worth of cement under either side to seal the roofing down and then nail it down making sure it still stays flat and even as you go.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Roll out the first sheet and ensure that it lies flat and even.
Melting bitumen rolls 1.
Plan so that no two butt joints are closer than 2 feet from each other.