I can t seem to find much about them online.
Roof sleeper definition.
To search the glossary for a specific word or phrase hit the ctrl and f buttons on your keyboard simultaneously and enter the keyword you wish to search for.
They are typically used to elevate piping ductwork hvac equipment walkways pv solar supports and more from rooftops.
1 4 6 4 mm minimum gap where the decking meets a solid wall maximum of 3 8 9 5 mm recommended 3 16 4 8 mm gap between boards.
The building inspector wrote on the elevation plans that we need roof sleepers for our gable dormers.
Sleepers are placed between the deck surface and the ground or slab below it.
What are they exactly.
Mac users please click command f.
Joe those are the false valleys that will sit flat on the existing roof.
Each term is accompanied by a brief definition.
Decking laid directly over packed soil will rot quickly and wood laid over concrete rots as well when moisture is trapped between the two materials.
This is the standard gapping for duralife products air should be allowed free movement under the structure do not.
Thanks in advance joe.
Roof top deck with sleeper system install guide.
Deck must be designed to ensure that proper drainage and air flow are maintained.
Resonne building and design 2 050 views.
The sleeper standoff support offers a strong and economical solution for creating an elevated rooftop standoff from existing sleeper supports or roof curb.
Rooftop sleeper standoff support.
Fasten the sleepers through the shims with powder actuated fasteners.
Sleeper joists are wooden boards installed on top of an existing subfloor that are typically used as support for hardwood flooring.
Fasten the sheet with 2 1 2 inch coated screws every 6 inches along the walls and every 8 inches across the sheet.
However because the subfloor may have dips or.
On the sleeper system installation method you lay 2x4s flat install them perpendicular the opposite way across the joists.
Subfloor sleeper are used in basements to protect certain types of flooring such as laminate hardwood and carpet.
Your valley jacks will get nailed to them.
Sleeper system installation brochures pdf this installation method works well when joists are not 16 o c or if it s a new construction deck or a deck remodel where there aren t any height restrictions.
The sleeper joists follow the same arrangement and spacing as the main home joists located under the subfloor.
Step 3 start underlayment set the first sheet of underlayment tongue to the wall with the long side perpendicular to the sleepers and 1 2 inch from the wall.
Most basements have concrete floors which have the potential to draw moisture.
Concealed roof gutter for a modern home los angeles home builder duration.